Acceptance criteria: agreeing what done means before you start

Acceptance criteria define when work is complete and correct. How to write them testably, the formats that help, and why vague ones cost the most.

How-toA

Acceptance criteria state what has to be true for a piece of work to be accepted. They exist because «done» means different things to the person who asked and the person who built, and the gap between those two meanings is where rework, arguments and late delivery live.

What good acceptance criteria look like

  • Testable: somebody other than the author can check them and reach the same answer.
  • Written before the work starts, not assembled during review to justify a rejection.
  • Focused on outcome rather than implementation, so they do not dictate how to build it.
  • Complete enough to cover the unhappy paths — what happens on bad input, on failure, on empty state.
  • Independent of each other, so one failing does not obscure the rest.
  • Agreed by whoever will actually accept the work, not by a proxy who will be overruled.
  • Free of adjectives like «fast», «intuitive» and «robust» unless a number follows.

Formats that help

Given-when-then is the most common: given some starting state, when something happens, then a specific result follows. Its value is not the ceremony but the discipline — it forces a concrete starting state and a checkable outcome, which is precisely what vague criteria lack. A simple checklist works just as well for straightforward items, and a worked example with real values often beats both for anything involving calculation, because arguments about rounding and edge cases surface immediately rather than at review.

Non-functional criteria need numbers. «The page should load quickly» is not a criterion; «the page renders in under two seconds on a mid-range phone over 4G» is. Without the number, the only honest answer at review is that nobody knows whether it passed.

Criteria matter most when the people building the work are not your own employees. Software team augmentation puts external developers inside your process, and the written definition of done is what keeps that arrangement honest.

Why vague criteria cost the most

  1. Work is built against an assumption, reviewed against a different one, and redone — the most expensive possible sequence.
  2. Review becomes a negotiation rather than a check, which takes longer and damages trust.
  3. Estimates become meaningless, since nobody knows the actual scope until review.
  4. Scope expands quietly, because anything unstated can be claimed as implied.
  5. Testing cannot start until somebody decides what passing means.
  6. Where money is attached — a contract, a milestone payment — the dispute is no longer internal.

Ettex Tasks keeps the criteria on the item itself, where the person doing the work and the person accepting it see the same text, and the history shows if they changed mid-flight. That record settles most review disagreements before they become conversations.

Frequently asked

What makes acceptance criteria good?

They are testable by someone other than the author, written before work starts, outcome-focused, and cover failure and edge cases as well as the happy path.

Do they need a particular format?

No. Given-when-then enforces useful discipline, but a checklist or a worked example with real values often works better for simple or calculation-heavy items.

How should performance criteria be written?

With numbers and conditions. «Loads quickly» cannot be checked; «renders in under two seconds on a mid-range phone over 4G» can.

MI
Written by Maria I.

Part of the Ettex team — writing about product, engineering and the future of work.