Building control: getting the work signed off

Building control checks that work meets the building regulations. The two routes, when approval is needed, and why the completion certificate matters years later.

How-toB

Building control is the process that checks construction work against the building regulations. It is separate from planning permission, which decides whether something may be built at all — and the two are confused constantly, with owners who have planning consent assuming they are clear to proceed.

What building control covers

  • Structural stability, including anything that removes or alters load-bearing elements.
  • Fire safety: escape routes, alarms, compartmentation and the materials used.
  • Thermal performance and ventilation, which drive much of the detail in current regimes.
  • Drainage and waste, including where new connections meet existing systems.
  • Electrical and heating work, which in several regimes may be self-certified by registered installers.
  • Access and usability requirements.
  • Sound insulation between dwellings.

The two routes and when approval is needed

Most regimes offer a full plans route, where drawings are checked before work starts, and a building notice route, where you simply notify and are inspected as you go. Full plans costs more time up front and buys certainty: problems are found on paper rather than after the blockwork is up. The building notice route suits small, familiar jobs and is a poor idea for anything structural, because the first time an inspector sees a defect is when it already exists in brick.

Work done without building control does not become lawful with age in the way planning breaches sometimes do. It surfaces at sale, when the buyer's solicitor asks for certificates — and the usual remedy, indemnity insurance, covers the buyer against enforcement rather than against the work being wrong.

Why the completion certificate matters years later

  1. It is the document a buyer's solicitor asks for, and its absence delays or kills sales.
  2. It evidences that inspections happened at the right stages, which photographs do not.
  3. Insurers and mortgage lenders may ask for it after a fire or structural claim.
  4. It is needed when later work builds on the earlier work — an extension on an unsigned-off foundation is a problem twice over.
  5. Keep it with the drawings and the approval, since they are always requested together.
  6. Request it actively at the end of the job, because contractors move on and certificates are routinely never collected.

Ettex Records is the sensible home for the approval, inspection dates and completion certificate against the property, which is exactly the bundle requested years later by somebody you have not met yet. The same file naturally holds any survey that preceded the work.

Frequently asked

Is building control the same as planning permission?

No. Planning decides whether something may be built; building control checks that it meets the construction standards. Both may be required, and having one does not satisfy the other.

What is the difference between full plans and a building notice?

Full plans checks drawings before work starts and buys certainty; a building notice is inspected as you go and is a poor choice for structural work.

Why does the completion certificate matter?

It is what a buyer's solicitor, insurer or lender asks for later. Without it, sales stall and claims get harder.

MI
Written by Maria I.

Part of the Ettex team — writing about product, engineering and the future of work.

More posts
Get the best of the Ettex blogProduct news, guides and tips — straight to your inbox, no spam.