Cost of quality is the total a business spends on getting things right plus the total it spends because things went wrong. Stated that way it sounds like an accounting exercise; its value is that it makes visible the second half, which never appears as a line in any budget and is usually several times larger than the first.
Prevention and appraisal are budgeted, so they are visible and easy to cut. Failure costs are absorbed: rework happens inside normal production hours, a credit note reduces revenue rather than appearing as a cost, a delayed delivery is handled by overtime nobody attributes to quality. The result is an organisation that can tell you precisely what inspection costs and has no idea what defects cost, which reliably produces the wrong decision — cutting the measurable spend and increasing the unmeasured one.
Estimate roughly rather than measuring precisely. A figure assembled in an afternoon from scrap records, credit notes and an honest guess at rework hours is accurate enough to change decisions, and waiting for a rigorous system means the number never exists at all.
Ettex Sheets is enough to hold the four categories with the sources behind each, which is more than most small manufacturers have and takes an afternoon to assemble. The internal failure half overlaps directly with first pass yield, since rework counted honestly there is the same money appearing in this calculation.
The total of prevention and appraisal spending plus internal and external failure costs — the money spent getting things right and the money spent because they went wrong.
Because it is absorbed rather than budgeted: rework happens in normal hours, credit notes reduce revenue, and overtime is attributed elsewhere.
That quality is being inspected in rather than built in, which is expensive and incomplete — inspection finds defects, it does not prevent them.
Payback period measures how quickly an investment returns its cost. How to calculate it, what it deliberately ignores, and when it is the right test.
First pass yield measures what got through without rework. Why it is harsher than scrap rate, how to calculate it across steps, and what a high figure can conceal.
Lead time is how long something actually takes from order to arrival. How to measure it rather than quote it, why the average is the wrong figure, and what variation costs.