A first article inspection report proves the production process can make the part to drawing. What an FAI report contains, when a new one is required, and how to avoid a rejected submission.
A first article inspection report documents that the first part made by a production process meets every requirement on the drawing and specification. It is not a check of one good part; it is evidence that the process, tooling, materials and methods as set up can produce conforming parts. First article inspection is standard in aerospace, defence and automotive supply chains, and customers routinely reject shipments whose FAI report is missing or incomplete.
In aerospace, AS9102 defines a common format with three forms: part number accountability (what the part is and how it breaks down), product accountability for raw material, special processes and functional testing, and characteristic accountability, where every drawing requirement is listed with its result. Other industries use similar structures under different names, and the automotive equivalent sits within production part approval. Even where no standard is mandated, following this structure makes an FAI report easy for a customer to review.
Balloon every requirement on the drawing, including notes and general tolerances. Most rejected FAI reports fail on an unnumbered note, not on a dimension.
Each first article inspection produces a bundle: the ballooned drawing, measurement data, certificates and approvals. Filed as loose documents, they are hard to find when a customer or auditor asks for the FAI behind a shipment. Ettex Records keeps one record per part and revision with the report, certificates and approval status attached, so "which parts need a new FAI after this change" becomes a filter. Ettex is not dedicated FAI software — there is no automatic ballooning of drawings and no direct capture from coordinate measuring machines — but it holds the evidence and its status reliably.
An FAI sits alongside routine controls rather than replacing them: ongoing checks are recorded on a quality control sheet, failures raise a non-conformance report, and supplier certificates are reviewed as part of incoming inspection.
The terms overlap. First piece inspection often refers to checking the first part of each run or setup; first article inspection is the formal verification of a new or changed production process, with a full report.
Often yes, when only some characteristics are affected by a change. The report should identify the baseline FAI and cover the changed characteristics in full.
The manufacturer performs it and submits the report; the customer may review, witness or repeat parts of it depending on the contract.
A submittal log shows every product, drawing and sample that needs approval, where it is, and what is holding it up. The columns that matter and how to keep reviews moving.
A due diligence pack is the seller's side of a transaction: the organised evidence a buyer will request. What goes in it, how to structure it, and how to avoid the late surprises that cut the price.
AML training for employees has to fit the firm's risks and each role's exposure. What to cover, how often, and the training records an inspection will ask for.