Version history: using it for more than undoing mistakes
Version history answers who changed what and when, not just how to get an earlier draft back. How to read it, what it does not cover, and how long it is kept.
Lockout tagout fails on the parts nobody photographs — group lockout, shift handover, and the energy source that was never on the procedure.
Lockout tagout — LOTO — is the control of hazardous energy during servicing and maintenance: isolating every energy source feeding a machine, locking each isolation in the safe position, tagging it to say who applied the lock and why, and verifying that the machine cannot start before anyone puts a hand inside it. The padlock is the visible part. The programme around it is what actually prevents the injury.
Most serious incidents in this area do not happen because somebody skipped the lock. They happen because one energy source was missed — stored pressure, a capacitor, a raised load held by gravity, a second feed nobody documented — or because a machine was re-energised while another person was still working on it.
Switching off the supply is not isolation. Hydraulic and pneumatic pressure remains in the lines, capacitors hold charge, springs stay compressed, a raised platform or tool remains held by gravity, and thermal energy persists long after the power is off. A machine-specific procedure earns its cost precisely here: it names each of those for that machine and says how each is released or blocked. Verification — attempting a start with the controls, testing for absence of voltage, bleeding down a line and confirming zero on a gauge — is the step that converts a belief into a fact.
Write the procedure at the machine, with the machine in front of you, and have somebody who maintains it walk through it. Procedures written from a manual routinely miss a feed that was added years after installation and appears on no drawing.
A tag communicates; a lock prevents. Where an isolation device physically cannot accept a lock, a tag-only approach carries additional requirements and additional risk, and the correct long-term answer is usually to modify the isolation so it can be locked. Treating a tag as equivalent to a lock is a documented cause of serious injury, and it is the shortcut that becomes normal quietly, one machine at a time.
Isolation steps like these are usually written into a job safety analysis for the task, so the crew agrees the hazards and controls for each step before the first lock goes on.
A LOTO programme lives or dies on whether the machine-specific procedures are current, findable at the machine, and reviewed. Ettex Docs holds them with version history so the version in force is recoverable and a revision is visible; Ettex Forms collects the annual procedure reviews and the observations that go with them; and Ettex Records keeps the training records per person and per role alongside the equipment file — the same file that holds the permit to work paperwork where the two systems meet.
Plainly: this is documents, forms and records, not a safety system, and none of it is safety advice. What your programme must contain, and the specific requirements for tag-only isolation and for group lockout, come from your regulator and from competent advice.
The control of hazardous energy during servicing: isolating every energy source, locking each isolation, tagging it with who and why, and verifying zero energy before work starts.
A lock physically prevents re-energisation; a tag only warns. Tag-only isolation carries extra requirements and extra risk, and is a last resort rather than an equivalent.
Machine-specific procedures are the norm, because energy sources differ per machine. Limited exceptions exist for simple single-source equipment, defined by the regulation that applies to you.
Only the person who applied it, except through a documented exception requiring verification that the person is not on site and authorisation by management.
Version history answers who changed what and when, not just how to get an earlier draft back. How to read it, what it does not cover, and how long it is kept.
Business succession planning decides who takes over ownership, how it is valued and funded, and when. The questions owners avoid, and the documents that make the answer real.
AGM meeting minutes evidence that the annual general meeting was properly held and what it resolved. What has to appear, what should be left out, and how long to keep them.