Proof approval: the sign-off before anything is printed

Proof approval is the client confirming what will be produced. What the proof must show, who is liable for an approved error, and how to keep approvals traceable.

How-toP

Proof approval is the moment a client confirms that what they have seen is what should be produced. It exists because print and manufacture are irreversible: once five thousand copies exist with a wrong telephone number, the question is not how to fix it but who pays, and the answer is decided entirely by what was approved and how.

What proof approval has to establish

  • That the client saw the actual content, not a description of it.
  • Which version they saw, identified by a number or date rather than «the latest one».
  • That colour expectations are understood, since a screen proof cannot represent printed colour reliably.
  • Quantities, finish, stock and size — the specification as well as the artwork.
  • The deadline implications, because approval usually starts a production clock.
  • Who approved it, and that they had authority to, which matters when a junior contact signs for a large order.

Who is liable for an approved error

Generally the approver, which is why the mechanism matters so much. Standard terms in print and manufacture place responsibility for content on the client once a proof is signed off, and that is both common and defensible — but it only holds if the approval is evidenced. A verbal «yes that's fine» on a phone call, or an email saying «go ahead» without reference to a version, leaves the supplier arguing about what was actually agreed. The strongest position for both sides is a specific version, explicitly approved, in writing.

Flag anything you noticed and did not change. If a supplier spots a likely error and prints it because the proof was approved, the relationship rarely survives the invoice — pointing it out before production costs nothing and is remembered.

Approval settles what is produced; quantity settles how much of it you live with. A print run looks cheaper per unit at volume, and the saving disappears when half the stock becomes obsolete.

Keeping approvals traceable

  1. Number every proof version and put the number on the proof itself, not just in the email.
  2. Record who approved, when, and for which version, in one place rather than across a mail thread.
  3. State what approval covers — content, colour, specification — so a dispute about one does not reopen all three.
  4. Set a validity period, since an approval from six weeks ago may predate a specification change.
  5. Keep the approved file separately from working files, because the question later is what was actually signed off.
  6. Reissue for approval after any change, however small, as the commonest disaster is a late amendment nobody reconfirmed.

Ettex Sign captures the approval against a specific version with the date and the person, which is precisely the evidence missing when an approval was given informally. The proof itself and the final approved file belong together in the job record, since the two are compared whenever anything goes wrong.

Frequently asked

Who is liable if an approved proof contains an error?

Usually the approver under standard print and manufacturing terms — but only where the approval is evidenced against a specific version.

Can a screen proof confirm colour?

Not reliably. Screen and print differ, and colour expectations should be set separately, ideally with a physical proof where it matters.

Does a small late change need re-approval?

Yes. A late amendment that nobody reconfirmed is the commonest cause of a reprint, and the version number is what makes the approval meaningful.

MI
Written by Maria I.

Part of the Ettex team — writing about product, engineering and the future of work.

More posts
Get the best of the Ettex blogProduct news, guides and tips — straight to your inbox, no spam.