Acceptance testing: deciding whether to sign it off

Acceptance testing establishes whether delivered work meets the agreed criteria. Who writes the tests, what deemed acceptance means, and why sign-off matters.

How-toA

Acceptance testing is the process by which a customer decides whether delivered work meets what was agreed. It is the moment risk transfers, payment becomes due and the supplier's obligations narrow — which is why the criteria matter more than the testing.

What acceptance testing establishes

  • Whether the deliverable meets the acceptance criteria, as written rather than as hoped.
  • The date from which warranty periods and support obligations run.
  • The trigger for milestone payment in most contracts.
  • What remains outstanding, recorded as defects with severity levels.
  • Whether defects are blocking or can be fixed after acceptance.
  • Not whether the thing is useful, which is a question the criteria should have answered earlier.

Who writes the criteria, and when

The customer, before work starts — not the supplier, and not during the test window. Criteria written late are written by whoever has the energy, and they tend to describe what was built. Good criteria are testable and binary: a stated response time under a stated load, not "performs well". They should also cover the boring paths, because the demonstration will use the happy one. Where the deliverable replaces a live system, parallel running for an agreed period is usually a better test than any script.

Deemed acceptance clauses are the sharpest term in this area. If the customer does not respond within a defined window, the deliverable is treated as accepted — so a test period that collides with a holiday shutdown can transfer risk by silence rather than by decision.

Why sign-off matters

  1. It fixes what was delivered, which ends later arguments about scope.
  2. It starts warranty periods, which are shorter than most customers assume.
  3. It releases payment, so suppliers push for it and customers should not resist on principle.
  4. Conditional acceptance with a defect list is usually better than refusing outright.
  5. Record severity and agreed fix dates, not just the fact of a defect.
  6. Keep the criteria, test results and sign-off together — they are one document in practice.

Ettex Forms suits the test record with criteria, results and defect severity in one structure, so acceptance is evidenced rather than remembered.

Frequently asked

Who should write acceptance criteria?

The customer, before work begins. Criteria written during the test window tend to describe what was built.

What is deemed acceptance?

A clause treating the deliverable as accepted if the customer does not respond in time — risk transfers by silence.

Should acceptance be refused over minor defects?

Usually not. Conditional acceptance with a severity-ranked defect list and agreed fix dates serves both sides better.

MI
Written by Maria I.

Part of the Ettex team — writing about product, engineering and the future of work.

More posts
Get the best of the Ettex blogProduct news, guides and tips — straight to your inbox, no spam.