Global claim: when every delay is blamed at once

A global claim attributes total loss to a group of events without linking each to each. When courts accept one, and why they usually will not.

How-toG

A global claim presents the total overrun cost of a project and attributes it to a group of employer-caused events collectively, without demonstrating what each event cost. Contractors reach for it when records are thin, which is precisely why tribunals treat it with suspicion.

What makes a claim a global claim

  • A single total sum claimed for multiple events.
  • No attempt to attribute specific loss to specific causes.
  • Reliance on the difference between tendered and actual cost.
  • An implicit assertion that nothing else contributed to the overrun.
  • Often a late-stage repackaging of claims that were never properly notified.
  • Not merely a composite claim, where individual heads are still particularised.

When a court will entertain one

Where it is genuinely impossible or impracticable to disentangle the causes — not merely inconvenient, and not because records were not kept. The contractor must still show that the events were the employer's responsibility and that they caused loss. The fatal weakness is that if any material part of the overrun was the contractor's own doing, the whole claim can fail, because the total figure necessarily includes that part. Some courts will apportion rather than dismiss outright, but a contractor cannot count on it.

Pleading a global claim invites the defence to find one significant contractor-caused delay and stop there. A properly particularised loss and expense claim survives the loss of individual heads; a global claim may not survive the loss of any.

How to avoid needing one

  1. Notify each relevant event as it occurs, separately.
  2. Keep allocation records tying labour and plant to specific disruption.
  3. Price variations as they are instructed rather than accumulating them.
  4. Maintain the programme and update it, so delay analysis has a baseline.
  5. Where no contractual basis exists at all, consider whether quantum meruit is the better route.
  6. Treat a global claim as a last resort, not a shortcut around record-keeping.

Ettex Records keeps the instructions, notices and daily records in one place, which is what makes a particularised claim possible — and makes a global claim unnecessary.

Frequently asked

Are global claims allowed?

Sometimes, where disentangling causes is genuinely impracticable — but not where records simply were not kept.

What is the main risk?

If a material part of the overrun was the contractor's own fault, the whole claim can fail because the total includes it.

What is the alternative?

A particularised loss and expense claim, built from contemporaneous records event by event.

MI
Written by Maria I.

Part of the Ettex team — writing about product, engineering and the future of work.

More posts
Get the best of the Ettex blogProduct news, guides and tips — straight to your inbox, no spam.