Scrap rate is the proportion of material or units that cannot be sold or used — destroyed by the process rather than by a customer rejecting it. It is one of the few manufacturing numbers almost everybody tracks, and one of the most frequently understated, because a surprising amount of scrap never reaches the measurement point.
A scrapped unit costs the material plus everything already added to it: the machine time, the labour, the energy, the handling and the capacity consumed producing something that will never be sold. Scrapping late in a process can cost several times what the raw material did, which is why the stage at which defects are found matters more than the total rate. A plant scrapping two per cent at final inspection has a worse problem than one scrapping four per cent at first operation, and a single headline percentage conceals that entirely.
Watch for scrap that is recorded as something else. Material returned to stock but unusable, parts quietly re-run as a new batch, and offcuts counted as planned loss when the design changed — each keeps the reported figure low while the money leaves at the same rate.
Losses show up differently depending on what you divide by. OEE expresses them as a share of theoretically possible output, which is why generous planned downtime inflates it without anything improving.
Ettex Sheets holds quantities with causes and the process step, which is the minimum needed to see where the money actually leaves. The same records feed first pass yield, where rework appears alongside outright scrap, and the two together describe the full cost of getting it wrong.
By value where possible, per process step, separating planned loss from unplanned and including setup scrap.
Because a unit scrapped late carries all the labour, machine time and energy already added. Two per cent at final inspection can cost more than four per cent at first operation.
In setup and changeover, in material returned to stock but unusable, and in offcuts still counted as planned loss after a design change.
Debt finance funds a business through borrowing repaid with interest. What lenders require, what it costs beyond the rate, and when it is wrong.
Completion accounts adjust the price using accounts drawn up after closing. How the mechanism works, what gets disputed, and how to narrow it.
Indexation ties contract prices to a published index. Which index to choose, the caps that matter, and why it rarely matches real costs.