Site diary: the daily record that settles construction disputes
A site diary records what happened on site each day. What to capture, why weather matters, and how it becomes evidence in a delay claim.
A shift handover transfers knowledge between teams who never meet. What it must contain, why verbal-only fails, and how to keep it short enough to happen.
A shift handover is the transfer of what the outgoing team knows to the incoming one. In any operation running more than one shift it is the single highest-risk routine moment of the day: two groups of people, one of them tired, exchanging information under time pressure about things that are still in progress.
Spoken handovers are fast and fit the pressure of a shift change, and they fail in predictable ways: the outgoing person forgets an item, the incoming one mishears a number, and nothing exists afterwards to check against. Investigations into major industrial incidents have repeatedly identified handover as a contributing factor, usually where it was verbal, rushed or conducted by somebody who was not present for the event being described. The workable form is written and brief, read by the incoming person while the outgoing one is still there to answer questions — which is a different thing from a document emailed after they leave.
Overlap the shifts by a few minutes deliberately. A handover conducted while one team is already walking out is a transmission rather than an exchange, and the questions that reveal misunderstandings are asked only when somebody has time to ask them.
Ettex Notes suits the handover itself — fixed headings, written during the shift, visible to whoever comes next without being sent anywhere. Where the shift also completes fixed checks, those belong in the opening and closing checklists rather than being retyped into the handover.
Work in progress with its current state, anything that went wrong, equipment out of service, authorised deviations, and what the next shift must pick up.
No. Verbal-only handovers fail predictably and leave nothing to check against; investigations repeatedly identify them as a contributing factor in incidents.
Short enough to happen every time. A few minutes of deliberate overlap matters more than length, because questions get asked only when there is time.
A site diary records what happened on site each day. What to capture, why weather matters, and how it becomes evidence in a delay claim.
Knowledge capture fails as a documentation project and works as a habit attached to real work. Where to start, what to skip, and why the expert is the wrong person to write it.
A decision log records what was decided, by whom, and what was rejected. The format that takes two minutes, and why the rejected options are the part worth keeping.