Sum insured: the number that decides what you get back

The sum insured caps any payout and drives the premium. How each type is calculated, why it drifts out of date, and what average does to an underinsured claim.

How-toS

The sum insured is the maximum a policy will pay, and it is set by the policyholder rather than the insurer. That single fact explains most disappointing settlements: nobody checks a figure they chose themselves until the moment it matters, and by then it is years out of date.

How each sum insured is calculated

  • Buildings: the cost to rebuild, including demolition, site clearance, professional fees and compliance with current regulations — not the market value, which is a different and usually lower number.
  • Contents and machinery: replacement cost as new, unless the policy is written on an indemnity basis that deducts for wear.
  • Stock: typically the maximum value held at any point in the year, not the average, since a fire in peak season does not care about your annual mean.
  • Business interruption: gross profit as the policy defines it, which is not the accounting definition and is where most errors live.
  • Indemnity period: how long the business would realistically take to recover, which is almost always longer than the twelve months people default to.

Why the figure drifts

Rebuild costs move with construction prices rather than property prices, and those two have diverged sharply at times. Regulations tighten, so rebuilding to today's standard costs more than the original build. Stock levels rise as a business grows without anybody revisiting the schedule. And index linking, where it applies, adjusts by a general measure that may lag what actually happened to your particular costs — which means a policy that looks maintained can still be well short.

Market value is not rebuild cost, and using it is the single commonest error on buildings. A property worth less than it costs to rebuild is normal in many areas, and insuring it for the sale price leaves a shortfall that only appears after a total loss.

What average does to an underinsured claim

  1. Where the sum insured is below the true value, many policies apply average and reduce the payout by the same proportion.
  2. Insure for half the real value and a claim of any size is settled at roughly half, not just claims above the limit.
  3. It applies to partial losses, which is why it bites far more often than total losses do.
  4. Business interruption underinsurance has the same effect on the most complex part of a claim.
  5. Revalue properly rather than uplifting last year by a percentage.
  6. Record the basis of each figure, so the position can be explained rather than defended.

Ettex Sheets suits the schedule behind the policy — each building, machine and stock line with the basis of its value and when it was last reviewed. That record is what makes the annual revaluation a short task instead of the thing nobody gets to.

Frequently asked

Should buildings be insured for market value?

No. The figure is the cost to rebuild including demolition, fees and current regulations, which is often higher than market value.

What is average in an insurance policy?

Where the sum insured is below true value, the insurer reduces the payout by the same proportion — so half-insured means roughly half-paid, even on small claims.

How should stock be valued?

Usually at the maximum held at any point in the year rather than the average, since a loss at peak is the risk being covered.

MI
Written by Maria I.

Part of the Ettex team — writing about product, engineering and the future of work.

More posts
Get the best of the Ettex blogProduct news, guides and tips — straight to your inbox, no spam.