Rebuild cost: the figure that is not the market value

Rebuild cost is what it would take to reconstruct a building from scratch. What it includes, why it diverges from market value, and how often to reassess it.

How-toR

Rebuild cost is what it would take to demolish what remains and construct the building again. It is the figure a buildings policy should be based on, and it is routinely confused with what the property would sell for — two numbers that can differ by a factor of two in either direction.

What rebuild cost includes

  • Demolition and removal of what is left after the loss.
  • Site clearance, and the hoarding and protection needed while work proceeds.
  • Construction to current regulations, which may be considerably more demanding than when it was built.
  • Professional fees: architect, engineer, surveyor, building control.
  • Planning and statutory costs where consent is needed again.
  • External works: drives, boundary walls, drainage, landscaping where insured.
  • Inflation during the rebuild period, since prices move while the work happens.
  • Not the land, which is the main reason it differs from market value.

Why it diverges from market value

Market value includes land and reflects location and demand; rebuild cost reflects only construction. In a desirable area the market value far exceeds rebuild cost, and insuring at market value simply wastes premium. In a low-demand area the reverse holds — a property worth little on the market can cost a great deal to rebuild, especially if it is period, listed, or built from materials that are now expensive to source. That second case is where underinsurance does real damage, and it is also where the mistake is most tempting, because insuring at the sale price feels prudent.

Listed and period buildings need a specialist assessment. Reinstating lime plaster, sash windows and handmade brick is not a per-square-metre calculation, and a conventional index-based figure will be far short of what conservation requirements actually demand.

How often to reassess

  1. A proper assessment at least every three years, and after any extension or material alteration.
  2. Indexation between assessments, understanding it tracks a general measure rather than your building.
  3. Immediately after a regulation change that affects reconstruction standards.
  4. When the use changes, since fit-out standards differ.
  5. Record the basis and the date, so next year starts from a reasoned figure rather than a guess.
  6. Check what the policy actually covers — some include professional fees within the sum insured rather than in addition.

Ettex Sheets holds each property with its rebuild figure, the basis of the assessment and when it was last done, which turns the three-year review into a scheduled task. The schedule behind the sum insured is assembled from the same record.

Frequently asked

Is rebuild cost the same as market value?

No. Rebuild cost excludes land and covers only construction, demolition, fees and compliance. The two can differ by a factor of two either way.

What does rebuild cost include beyond construction?

Demolition, site clearance, professional fees, statutory costs, external works and inflation over the rebuild period.

How often should it be reassessed?

Properly at least every three years, immediately after alterations, and whenever regulations affecting reconstruction change.

MI
Written by Maria I.

Part of the Ettex team — writing about product, engineering and the future of work.

More posts
Get the best of the Ettex blogProduct news, guides and tips — straight to your inbox, no spam.