Rebuild cost is what it would take to reconstruct a building from scratch. What it includes, why it diverges from market value, and how often to reassess it.
Rebuild cost is what it would take to demolish what remains and construct the building again. It is the figure a buildings policy should be based on, and it is routinely confused with what the property would sell for — two numbers that can differ by a factor of two in either direction.
Market value includes land and reflects location and demand; rebuild cost reflects only construction. In a desirable area the market value far exceeds rebuild cost, and insuring at market value simply wastes premium. In a low-demand area the reverse holds — a property worth little on the market can cost a great deal to rebuild, especially if it is period, listed, or built from materials that are now expensive to source. That second case is where underinsurance does real damage, and it is also where the mistake is most tempting, because insuring at the sale price feels prudent.
Listed and period buildings need a specialist assessment. Reinstating lime plaster, sash windows and handmade brick is not a per-square-metre calculation, and a conventional index-based figure will be far short of what conservation requirements actually demand.
Ettex Sheets holds each property with its rebuild figure, the basis of the assessment and when it was last done, which turns the three-year review into a scheduled task. The schedule behind the sum insured is assembled from the same record.
No. Rebuild cost excludes land and covers only construction, demolition, fees and compliance. The two can differ by a factor of two either way.
Demolition, site clearance, professional fees, statutory costs, external works and inflation over the rebuild period.
Properly at least every three years, immediately after alterations, and whenever regulations affecting reconstruction change.
Debt finance funds a business through borrowing repaid with interest. What lenders require, what it costs beyond the rate, and when it is wrong.
Completion accounts adjust the price using accounts drawn up after closing. How the mechanism works, what gets disputed, and how to narrow it.
Indexation ties contract prices to a published index. Which index to choose, the caps that matter, and why it rarely matches real costs.