← All postsProduct

Introducing Boards: plan work visually

Ettex Boards: five columns, work-in-progress limits that actually block a move, and grouping by priority, assignee or label when the column view stops answering the question.

ProductI

A board is useful because it makes two things visible at a glance: what is in flight, and what is stuck. Ettex Boards is built around that rather than around decoration — five columns from Backlog to Done, limits on how much may sit in the middle of them, and the ability to regroup the same cards when the columns stop being the interesting axis.

What Boards gives you

  • Five columns: Backlog, To do, In progress, Review and Done — enough to show flow without turning the board into a process diagram.
  • A work-in-progress limit on Review, the column where queues actually form: three cards, and a move into a full column is refused rather than warned about.
  • Cards with assignee, priority, labels, due dates and attachments.
  • Regrouping: view the same cards by priority, by assignee or by label instead of by column.

The limits are the point

A board without limits becomes a list of everything somebody intended to do, which is a mood rather than a plan. A limit does something uncomfortable and useful: when Review is full, moving another card in is refused, so the only way forward is to clear a review or to explicitly decide what to drop. That conversation is the entire value. Teams that raise the limit whenever it blocks them have chosen a slower board with extra steps — the honest move is usually to lower it.

Watch Review rather than In progress. Work piling up in Review usually means one person is the bottleneck for approvals, which is a scheduling problem disguised as a capacity problem — and it is the commonest reason a board stalls while everybody looks busy.

When to regroup

  1. By column, for the daily question: what is moving and what is stuck.
  2. By assignee, when somebody is quietly carrying four things at once.
  3. By priority, before committing to a week — it exposes the gap between what is marked urgent and what is actually in flight.
  4. By label, when you need to see one workstream across the whole board.

Ettex Board suits a small team running one flow, and keeps the cards local so the board stays responsive. Where the work has to be reported on rather than moved — owners, dates, costs, history — that belongs in a register alongside, because a board answers what is happening now and a register answers what happened.

Frequently asked

What is the work-in-progress limit?

Three cards in Review. Moving a card into a full column is blocked rather than warned about.

Can I group cards by something other than column?

Yes — by priority, assignee or label. The cards are the same; only the grouping changes.

Is a board a replacement for a task list?

No. A board shows flow and bottlenecks; a list shows everything owed. Teams that need both usually keep the board for the current week and the list for the commitment.

SL
Written by Sofia L.

Part of the Ettex team — writing about product, engineering and the future of work.

More posts
Get the best of the Ettex blogProduct news, guides and tips — straight to your inbox, no spam.