Milestone: a date that means something was finished
A milestone marks a verifiable completion, not a point in the calendar. How to choose them, how many to have, and why percentage-complete reporting replaced them badly.
Triage sorts incoming requests by urgency and owner before anybody starts work. How to set priorities that hold, who should do it, and why first-in-first-out fails.
Ticket triage is the few minutes spent deciding what each incoming request is, how urgent it is and who owns it — before anybody starts solving anything. Teams that skip it work in arrival order, which sounds fair and means a password reset can sit ahead of an outage. The decision is being made either way; triage only makes it deliberate.
Because urgency is not evenly distributed and arrival order carries no information about it. Worse, pure queue order rewards whoever reports most often and punishes the person who waited politely — and the loudest requester is rarely the one with the most expensive problem. The other failure is subtler: without triage, the easy tickets get picked off by people wanting a quick win, and the difficult one ages at the bottom of the queue until it becomes a complaint.
Priority must mean something operationally or it is decoration. If high priority does not change who looks at it, in what order, or how quickly somebody is told, then every requester will learn to mark everything high — and they will be right to.
Time to first response, and the age of the oldest open item. The first is what people actually experience, and the second is the one that catches the quiet failure — a queue can look healthy on averages while three requests have been sitting for a month. Volume and closure counts describe how busy the team was rather than how well the queue was run, which is why they dominate most support reports.
Ettex Board suits triage directly: a column for untriaged, a priority on the card and a named owner, so the queue state is visible rather than reconstructed. Where a request needs to leave the team entirely, the escalation matrix decides who it goes to rather than the triage decision.
One named person per day on rotation, at fixed times. Shared responsibility reliably produces an untriaged queue by the middle of the morning.
Three. Four produces arguments about the middle two, and five means almost everything is filed in the centre where it carries no information.
Time to first response and the age of the oldest open request. Averages hide the item that has been waiting a month.
A milestone marks a verifiable completion, not a point in the calendar. How to choose them, how many to have, and why percentage-complete reporting replaced them badly.
The critical path is the sequence that sets the end date. How to find it without software, why most status reports chase the wrong tasks, and what float really means.
A due date without an owner and a consequence is a wish. How to set dates that hold, what to do when one slips, and why most overdue lists are ignored.