← All postsHow-to

Performance bond: money set aside against the contractor failing

A performance bond pays the customer if the contractor defaults. On-demand versus conditional, what it costs, and how claims actually work.

How-toP

A performance bond is an undertaking from a bank or insurer to pay the customer a sum — typically ten per cent of contract value — if the contractor fails to perform. It converts a promise from a company that might fail into a promise from an institution that probably will not.

What a performance bond covers

  • Losses from contractor default, up to the bond amount.
  • Costs of completing the work with a replacement contractor.
  • Sometimes liquidated damages for delay, depending on drafting.
  • A fixed percentage of contract value, not actual loss, in on-demand form.
  • Not defects appearing after the bond expires, which is why expiry dates matter.
  • Not an alternative to a parent company guarantee, since the two protect differently.

On-demand versus conditional

An on-demand bond pays against a compliant written demand, full stop. The bank does not investigate whether the contractor actually defaulted — it checks the paperwork and pays, leaving the contractor to argue afterwards. A conditional bond requires proof of breach and loss, which makes it far harder to call and far cheaper to buy. Contractors resist on-demand bonds because a wrongful call is money gone until litigation recovers it; customers want them for exactly the same reason. Most disputes in this area are not about whether the contractor failed but about whether the demand complied with the bond's formalities.

Bonds tie up the contractor's facilities. The bank counts the bond against borrowing capacity, so a contractor carrying several is less able to fund work — which can contribute to the very failure the bond protects against. On thin-margin work this is a real effect, not a theoretical one.

How claims actually work

  1. Check the expiry date first, since many bonds lapse on practical completion.
  2. Follow the demand formalities exactly — wording, signatories, delivery method.
  3. Expect the contractor to seek an injunction restraining the call, if the demand looks irregular.
  4. Recover under the bond, then account for the balance against actual loss.
  5. Keep the bond with the contract, since the obligation to maintain it is a contractual term.
  6. Monitor renewal where the bond period is shorter than the works.

Ettex Contracts keeps the bond with its expiry date and demand requirements attached, so a call is made correctly rather than rejected on form.

Frequently asked

What is the difference between on-demand and conditional?

On-demand pays against compliant paperwork without proof of default; conditional requires proof of breach and loss, and is much cheaper.

How much is a bond usually worth?

Commonly ten per cent of contract value, which is a contribution to completion costs rather than full protection.

What defeats a claim?

Usually a defective demand or an expired bond, not the merits of the default itself.

MI
Written by Maria I.

Part of the Ettex team — writing about product, engineering and the future of work.

More posts
Get the best of the Ettex blogProduct news, guides and tips — straight to your inbox, no spam.