A RACI matrix is a grid of tasks against roles with four letters in the cells. Its value is not the grid — it is the arguments it forces you to have early.
A RACI matrix maps tasks against roles and puts one of four letters in each cell: Responsible for the person doing the work, Accountable for the single person answerable for the outcome, Consulted for those whose input is sought before the decision, Informed for those told afterwards. It takes an hour to build and prevents the two failures that cost projects the most — work nobody picked up, and decisions three people believed were theirs.
The letters matter less than the conversation. Filling in a RACI forces someone to say out loud who approves the budget and who merely has views about it, which is a conversation most teams postpone until the disagreement is expensive.
One A per row, always. Two Accountables is the single most common error and it recreates exactly the ambiguity the matrix exists to remove — when both believe the other decided, nothing happens; when both decide, they conflict. If two people genuinely share accountability, the task is two tasks.
It is at its best on work crossing team boundaries, on projects with an external client or supplier, and anywhere a hand-off has previously gone wrong. It is close to useless on a team of four who sit together and already know who does what — there, the matrix is ceremony. It also cannot fix an absent decision-maker: if the person marked A is never available, the matrix documents the problem rather than solving it, which is at least a start.
Ettex Sheets is the natural home for the grid: import an existing XLSX with formulas intact, dropdown validation so cells only accept R, A, C or I, conditional formatting to colour the letters and — more usefully — to flag any row that does not have exactly one A, filters to read the matrix by role, and cell comments so a disagreement about a cell is recorded next to it. Version history shows how accountability changed between phases. The project plan around it belongs in Ettex Docs, the tasks themselves live in Ettex Board with assignees and due dates, and the people behind the roles sit in Ettex Contacts.
Plainly: Ettex has no project-management module in the formal sense. There is no RACI feature, no automatic validation of the matrix, no dependency or critical-path calculation, no resource levelling and no Gantt scheduling engine. It is a spreadsheet with validation and a board for the work. That is proportionate for most projects; a programme of many interdependent workstreams wants dedicated PM software.
A matrix is one way to lay this out; the content is the harder part. Roles and responsibilities have to name activities rather than titles, put numbers on every threshold, and say who holds the decision when the owner is away.
Two adjacent artefacts stop the matrix becoming decoration. A stakeholder register records who the people actually are rather than which roles exist, and an escalation matrix says what happens when the accountable person is unreachable.
Responsible, Accountable, Consulted, Informed — the four roles assigned per task in the matrix.
Responsible does the work; Accountable answers for the outcome and holds the decision. Several people can be Responsible; exactly one should be Accountable.
No. It is the most common mistake and it recreates the ambiguity the matrix exists to remove. If accountability genuinely splits, split the task instead.
Around twenty for a typical project — the tasks and deliverables where a decision or hand-off happens. Large matrices are not consulted.
Roles for anything beyond a handful of people, so the matrix survives staff changes. Names are fine on a small, stable project.
On a small co-located team where everyone already knows who decides. Its value comes from crossing boundaries — teams, suppliers, clients — where assumptions differ.
A RACI matrix is one hour and one rule: exactly one Accountable per row. Fill in the A column with the people involved, be mean with Consulted, and revisit it when the project changes phase.
How stock is valued changes reported profit and tax without anything physical changing. FIFO against weighted average, what cost includes, and the write-down nobody wants to make.
Staff turnover is easy to calculate and easy to misread. How to work it out, why voluntary and involuntary must be separated, and what a replacement actually costs.
Business interruption cover replaces lost profit while you cannot trade. How the sum insured is calculated, why the indemnity period is the number that matters, and what is usually excluded.