Schedule of condition: recording what it looked like before

A schedule of condition records the state of a property at a point in time. When it is worth having, what it must contain, and the disputes it prevents.

How-toS

A schedule of condition is a dated record of how a property looked at a particular moment, usually photographic and usually produced before something changes — a lease starting, building work beginning next door, or a tenant moving in. Its value is entirely negative in the best way: it exists so that an argument never happens.

What a schedule of condition must contain

  • Photographs with enough context to locate them — a close-up of a crack proves nothing if nobody can tell which wall it is on.
  • Written descriptions accompanying the images, since photographs age badly without words.
  • The date, and ideally evidence of it that is hard to dispute.
  • Coverage of everything that might later be claimed, including ceilings, floors and external elevations.
  • Existing defects stated plainly rather than glossed over, because the point is to record them.
  • Who prepared it and on whose instruction.
  • Acknowledgement by the other party where possible, which converts a record into agreed evidence.

When it is worth having

Before any work that could be blamed for damage — excavation next door, scaffolding over a neighbour, a refurbishment above an occupied floor. Also at the start of a commercial lease, where it limits a repairing obligation to the condition recorded rather than to some absolute standard, which can be the difference between a modest bill and a crippling one at the end of a term. In both cases the cost of preparing one is trivial against what it defends, and nobody ever regrets having one.

Unacknowledged is still useful but much weaker. A schedule the other side has seen and not disputed carries far more weight than one produced from your own files afterwards, so send it at the time and keep proof that you did.

The disputes it prevents

  1. Damage claims after neighbouring work, where pre-existing cracks would otherwise be inherited.
  2. Dilapidations at lease end, where the standard of repair is measured against the recorded state.
  3. Deposit disputes in residential lettings, which turn almost entirely on before-and-after evidence.
  4. Insurance claims, where the insurer asks what the condition was beforehand.
  5. Contractor disputes about who caused what, particularly on occupied sites.
  6. Sale enquiries, where a buyer asks about visible defects and their history.

Ettex Records holds the schedule with its images, date and the acknowledgement against the property, which is exactly the bundle requested years later. It sits naturally with any notice served before the work, since the two are read together when an argument does arise.

Frequently asked

What should a schedule of condition include?

Dated photographs with locating context, written descriptions, existing defects stated plainly, who prepared it, and ideally the other party's acknowledgement.

When is one most valuable?

Before neighbouring construction work, and at the start of a commercial lease where it caps the repairing obligation at the recorded condition.

Does it need to be agreed?

Not strictly, but a schedule the other side has seen and not disputed is far stronger than one produced from your own files afterwards.

MI
Written by Maria I.

Part of the Ettex team — writing about product, engineering and the future of work.