Office move checklist: relocating without losing a week

An office move touches every system at once. What to settle months ahead, the items people forget, and the first day in the new building.

How-toO

An office move is a project with a fixed deadline, no slack and consequences that land on everybody at once. It is also one of the few operational events where a forgotten detail — a phone line, a key, an address on a bank mandate — can stop the business trading on a Monday morning.

What an office move checklist must cover months ahead

  • Lease dates at both ends: the new one starting and the old one ending, with any overlap deliberately arranged.
  • Dilapidations at the outgoing property, which are negotiated far more cheaply before the move than after it.
  • Connectivity at the new site, which has the longest lead time of anything and is the usual cause of delay.
  • Furniture and layout, decided from a plan rather than on the day.
  • Insurance for both sites during the overlap, plus cover for goods in transit.
  • Who is coordinating, with time actually allocated rather than added to a full job.

The items people forget

  1. Address changes beyond the obvious: bank mandates, insurers, registered office, customs registrations, suppliers who post invoices.
  2. Mail redirection, arranged early and for longer than feels necessary.
  3. Deliveries already scheduled to the old address in the weeks after the move.
  4. Keys, fobs and alarm codes at both ends, including those held by former staff.
  5. Equipment nobody owns: the server in a cupboard, the labelled archive boxes, whatever is in the loft.
  6. Disposal of what is not coming, which takes longer and costs more than anybody plans for.

Photograph the outgoing premises thoroughly before you leave, with dates. Dilapidations claims are argued over condition months later, and a landlord's schedule is far easier to challenge when you have your own record of what the place actually looked like.

The first day in the new building

Plan for nothing working and be pleasantly surprised. The practical arrangement is a short list of what must function on day one — network, phones, door access, the till or whatever takes money — tested the day before rather than discovered in the morning. Have somebody on site whose only job is fixing things, tell customers the address changed before they find out by arriving, and accept that the first week is not a normal week. Teams that schedule a deadline for the Monday after a move create two problems where there was one.

Ettex Board suits the move itself: one card per item, owners, dates, and a column for what must be live on day one. The lease dates and the notice deadlines that frame the whole thing belong in the property record, where they sit with everything else that expires.

Frequently asked

What has the longest lead time in an office move?

Connectivity at the new site, usually by a wide margin. It is the single most common cause of a delayed move.

What do people forget most often?

Address changes beyond the obvious ones — bank mandates, insurers, registered office — plus keys held by former staff and equipment nobody owns.

Should dilapidations be dealt with before moving?

Yes. They are negotiated far more cheaply before you leave, and your own dated photographs of the condition are the strongest evidence you will have.

MI
Written by Maria I.

Part of the Ettex team — writing about product, engineering and the future of work.