An office move is a project with a fixed deadline, no slack and consequences that land on everybody at once. It is also one of the few operational events where a forgotten detail — a phone line, a key, an address on a bank mandate — can stop the business trading on a Monday morning.
Photograph the outgoing premises thoroughly before you leave, with dates. Dilapidations claims are argued over condition months later, and a landlord's schedule is far easier to challenge when you have your own record of what the place actually looked like.
Plan for nothing working and be pleasantly surprised. The practical arrangement is a short list of what must function on day one — network, phones, door access, the till or whatever takes money — tested the day before rather than discovered in the morning. Have somebody on site whose only job is fixing things, tell customers the address changed before they find out by arriving, and accept that the first week is not a normal week. Teams that schedule a deadline for the Monday after a move create two problems where there was one.
Ettex Board suits the move itself: one card per item, owners, dates, and a column for what must be live on day one. The lease dates and the notice deadlines that frame the whole thing belong in the property record, where they sit with everything else that expires.
Connectivity at the new site, usually by a wide margin. It is the single most common cause of a delayed move.
Address changes beyond the obvious ones — bank mandates, insurers, registered office — plus keys held by former staff and equipment nobody owns.
Yes. They are negotiated far more cheaply before you leave, and your own dated photographs of the condition are the strongest evidence you will have.
Triage sorts incoming requests by urgency and owner before anybody starts work. How to set priorities that hold, who should do it, and why first-in-first-out fails.
A milestone marks a verifiable completion, not a point in the calendar. How to choose them, how many to have, and why percentage-complete reporting replaced them badly.
The critical path is the sequence that sets the end date. How to find it without software, why most status reports chase the wrong tasks, and what float really means.