Snagging list: catching defects while somebody else still has to fix them

A snagging list records the defects found before handover. Its value is entirely in the timing — the same defect is a five-minute fix before completion and an argument afterwards.

How-toS

A snagging list is the record of defects and unfinished items identified when work is inspected before handover — doors that catch, paint runs, missing seals, sockets that do not work, tiles laid short. It is produced by the client, their surveyor or the contractor’s own supervisor, and it exists because the moment of practical completion is the last point at which the incentive to fix things is on someone else.

That timing is the whole point. Before handover, the outstanding items are the contractor’s obligation and there is retention money against them. Afterwards the same items become a defects-liability negotiation, and the ones nobody wrote down become yours.

How to produce a snagging list properly

  1. Inspect room by room in a fixed order, and finish a room before moving on. Wandering produces duplicates and gaps.
  2. Record each item with its exact location, what is wrong and a photograph. "Scratch on glass" is not findable; "living room, left window, lower pane, scratch 100mm" is.
  3. Number every item and never reuse a number, even after an item is closed.
  4. Separate defects from incomplete work and from items outside the contract — they are resolved by different routes.
  5. Test rather than look: open every window and door, run every tap, switch every socket, flush everything, check the heating in every room.
  6. Issue the list formally with a date and, if the contract sets one, the response period.
  7. Re-inspect against the list and close items individually, with evidence. Do not close a room in bulk.

Photographs and location do the work

A snagging list fails on ambiguity more than on omission. If the contractor cannot find the item from the description, it comes back unfixed and the exchange costs both sides a week. A photograph attached to the entry, plus a room name and a position within the room, converts a disputed item into a work instruction. It also settles the argument that matters later: whether the defect was present at handover.

A defect is not the same as a snag caused by later use or by normal drying and settlement. New buildings crack slightly as they dry, and disputes over hairline cracking are routine. Photographing the state at handover is the only thing that separates the two categories afterwards.

Tracking items to closure

The list is a work queue, not a document — each item has a status, an owner and a date, and the point of the exercise is getting every one to closed with evidence. A board with a column per status and a card per item is the natural shape: Ettex Board tracks the items to closure with the photographs attached, Ettex Forms collects them on site as they are found rather than from notes typed up afterwards, and Ettex Records keeps the issued list, the re-inspection and the sign-off as the file you can produce if the retention is questioned — the same file the handover document should point at.

Directly: none of this is a substitute for a professional pre-completion inspection where the value at stake justifies one, and the rights you have at handover come from your contract and your jurisdiction, not from the list. What the list does is make sure that whatever those rights are, you can exercise them on a specific item with a date and a photograph.

Frequently asked

What is a snagging list?

A numbered record of defects and unfinished items found on inspection before handover, each with a location, a description and normally a photograph.

When should snagging be done?

Before practical completion or handover, while the incentive and the retention still sit with the contractor. A second inspection near the end of the defects liability period catches what emerged in use.

Who pays for snagging?

Fixing the items is the contractor’s obligation under the contract. An independent inspection is usually commissioned and paid for by the client.

What is the difference between a snag and a defect?

In practice they overlap; a snag is usually a minor finishing item and a defect a failure of workmanship or materials. The distinction matters mainly for which contractual route resolves it.

EP
Written by Elena P.

Part of the Ettex team — writing about product, engineering and the future of work.

More posts
Get the best of the Ettex blogProduct news, guides and tips — straight to your inbox, no spam.