Final account: settling what the job actually cost

The final account reconciles the contract sum with what was built. What it includes, the deadlines that bind, and why it is settled late or never.

How-toF

The final account is the agreed statement of what a construction job cost once everything is counted: the contract sum, plus or minus every variation, claim, remeasurement and adjustment that happened along the way. It is the last commercial conversation on a project and the one most likely to be conducted by people who are tired of each other.

What the final account includes

  • The original contract sum as the starting point.
  • Variations, valued on the contract rules rather than on what either side thinks is fair.
  • Remeasurement of provisional quantities against what was actually built.
  • Provisional sums expended, with the difference against the allowance shown.
  • Loss and expense claims where prolongation or disruption is established.
  • Liquidated damages deducted, if completion was late and the contract allows.
  • Retention, shown separately so it is not quietly absorbed into the settlement.
  • Adjustments for defects not remedied, substantiated rather than asserted.

The deadlines that bind

Most contracts set a period after practical completion for the contractor to submit documents, and a further period for the account to be agreed or certified. Those deadlines matter more than they appear: in several standard forms a contractor who fails to submit on time weakens their position considerably, and an employer who fails to issue a certificate within the stated window can find the contractor's figure becomes conclusive by default. Reading the timetable before the end of the job rather than after is therefore worth real money to whichever side remembers.

Keep contemporaneous records for every claim. A loss and expense claim assembled from memory eighteen months later rarely survives scrutiny, while a site diary showing what happened on which day, with instructions dated, usually settles the argument without anybody reaching for a lawyer.

Why it settles late or never

  1. The people who negotiated the variations have moved to other projects and nobody owns the file.
  2. Records are incomplete, so claims cannot be substantiated and are abandoned rather than argued.
  3. Both sides open with positions rather than figures, which guarantees several rounds.
  4. Defects and the account get tangled together, when they are better dealt with separately.
  5. Cash pressure makes one side accept less to close it, which is a real and avoidable cost.
  6. Agree the uncontested elements first, so the dispute narrows to the items that genuinely differ.

Ettex Invoices carries the contract sum with its variations, provisional sums and retention as separate lines, so the account is assembled from a record rather than reconstructed from recollection. The site diary and instructions that support the claims belong in the same project file.

Frequently asked

What goes into a final account?

The contract sum adjusted for variations, remeasurement, provisional sums, loss and expense, damages, retention and any substantiated defect deductions.

Do the contractual deadlines matter?

Considerably. Failing to submit or certify within the stated period can weaken a position or, in some forms, make the other side's figure conclusive.

Why do final accounts drag on?

Records are incomplete, the people involved have moved on, and both sides open with positions instead of figures.

MI
Written by Maria I.

Part of the Ettex team — writing about product, engineering and the future of work.